Our 5-Step Permit Approval Roadmap

01

Site Assessment & Feasibility

Review of existing conditions, project scope, zoning and applicable by-laws to confirm what approvals are required.

02

Engineering & OBC Design

Permit drawings, structural design, calculations and supporting documentation prepared to OBC requirements.

03

Municipal Submission

Application submission, documentation package coordination, and liaison with building examiners.

04

Examiner Comments & Revisions

Responding to examiner notices and preparing revised drawings or clarifications for resubmission.

05

Permit Issuance & Next Steps

Once the municipality issues the permit, we outline the engineering items to track through construction and inspections.

REGULATORY NOTICE & MUNICIPAL AUTHORITY DISCLAIMER

Municipal turnaround times, examination cycles, and final permit approval determinations are controlled by local municipal building departments and authorities having jurisdiction (AHJ) across Ontario. AECS focuses on technical compliance and engineering rigour to support a complete, high-quality submission.

REGULATORY & MUNICIPAL COMPLIANCE

Ontario Building Permit Acquisition & OBC Compliance

Professional permit coordination and stamped engineering packages for GTA municipalities. Whether you are a homeowner planning a renovation or a small business preparing a fit-out, AECS prepares the drawings and documentation your building department needs to review your application against the Ontario Building Code (OBC) and local zoning by-laws.

01 / RESIDENTIAL PERMITS

Residential Alterations & New Builds

Structural drawing packages for load-bearing wall removals, second-storey additions, basement secondary suites, underpinning, custom homes, and decks or accessory structures under Part 9 of the OBC.

02 / COMMERCIAL & INDUSTRIAL

Commercial Fit-Outs & Change of Use

Engineering for retail and office fit-outs, restaurant conversions, industrial unit modifications, mezzanines, and change-of-use or occupancy reviews under Part 3 of the OBC, where applicable.

03 / ZONING & APPROVALS

Zoning Review & Committee of Adjustment

Preliminary zoning reviews, minor variance applications, site plan approval support, and Committee of Adjustment submissions across Ontario municipalities.

PERMIT ENGINEERING SERVICES

Basement & Secondary Suites

Permit drawing preparation, code-review coordination and municipal submission support for basement apartments, side entrances, ADUs and secondary suites. Scope and outcomes depend on municipal zoning, the Ontario Building Code and site-specific conditions.

01 / IN-HOUSE RETROFIT

Legal Basement Apartments

Residential permit drawings and coordination for basement apartments, including side entrances and related code considerations.

ENGINEERING SCOPE

  • Existing-conditions review and suite layout planning
  • Egress, side entrance and window opening review
  • Fire separation and smoke alarm considerations
  • Permit drawings and municipal comment coordination

02 / DETACHED STRUCTURES

Garden Suites & Laneway Housing

ADUs and secondary suites planned with attention to site constraints, zoning and applicable municipal requirements.

ENGINEERING SCOPE

  • Footing, slab & structural frame design
  • Lot coverage, setback & height verification
  • Underground utility service tie-ins (water/sewer)
  • Emergency access route & tree protection compliance

03 / MULTI-UNIT CONVERSIONS

Additional Dwelling Units (ADUs)

Additional dwelling unit and multi-unit conversion support, subject to project scope, municipal rules and qualified technical review.

ENGINEERING SCOPE

  • Load-bearing and structural alteration review
  • Foundation and site-condition assessment
  • Applicable Ontario Building Code considerations
  • Coordinated permit drawings and technical documentation

* Note: AECS prepares drawings and coordinates code-review comments, but permit approval, issuance and review timelines are determined by the municipal building department and any other authorities having jurisdiction. Approval cannot be guaranteed.

Notice: Official municipal review timelines, Committee of Adjustment variances, and permit approval issuances are strictly subject to local building authority jurisdiction.

RESIDENTIAL ENGINEERING & ARCHITECTURE

Additions & Major Structural Renovations

Permit drawings, structural review and plan sets for home additions, interior renovations, decks, garages and alterations. We help you understand what your project needs before you submit to your municipality.

ONTARIO BUILDING CODE COMPLIANCE

Permit considerations: many additions, structural alterations, larger decks and garages need a building permit. Your municipality may also ask for zoning review or a minor variance. We prepare the drawings and structural documentation needed for submission.

Additions, Garages & Decks

Second-storey and rear additions, attached or detached garages, and decks. Where they apply, we check foundation and footing adequacy, framing and roof transitions, guards and stairs, and setbacks.

Load-Bearing Wall Removals & Open Concept

Interior alterations and wall removals: beam and header sizing, point load transfer paths and footing checks so the work can be reviewed for permit.

Basement Lowering, Underpinning & Walkouts

Sequential underpinning pin schedules, bench footing engineering, cut-out lintel designs, and drainage design for below-grade living conversions.

COMMERCIAL PERMITTING & ENGINEERING

Commercial Building Permits & Regulatory Approvals

Permit and engineering support for small-commercial projects: new openings, interior alterations, tenant improvements and change-of-use applications. Where applicable, we coordinate drawings, code review and zoning or by-law items with the municipal building department.

STRUCTURAL & MEP REVIEWS

01

Tenant Fit-Outs & Alterations

Permit drawings and engineering review for interior alterations, new or widened openings and tenant improvements. We check the work against the applicable Ontario Building Code requirements, including Part 3 where it applies.

OCCUPANCY & LIFE SAFETY

02

Change of Use & Zoning Classification

Support for change-of-use applications, including occupancy classification, life safety and fire separation considerations, and coordination with zoning and planning requirements as applicable.

STRUCTURAL REVIEW & DOCUMENTATION

03

Adaptive Reuse & Conversions

Structural review of existing conditions and proposed changes, load path checks, and permit documents for converting existing commercial spaces to a new use.

The scope of each project depends on site conditions and the requirements of the local jurisdiction. Review timelines and permit issuance are decided by the municipal building authority.

MUNICIPAL COMPLIANCE & PERMITS

Frequently Asked Questions

Practical guidance on submission packages, engineering seals, municipal review cycles and construction inspections. Requirements vary by municipality and project, so confirm details with the authority having jurisdiction.

TIMELINES & PROCESS

What is the typical municipal turnaround time for permit reviews?

The Ontario Building Code sets prescribed review timeframes for complete applications, generally ranging from 10 to 30 business days depending on building type and complexity. Actual timelines vary with municipal workload, application completeness, applicable law approvals such as zoning, and the number of comment cycles. AECS cannot guarantee municipal review times.

DOCUMENTATION & STAMPS

Which engineering drawings require sealed P.Eng certification?

Requirements depend on the scope of work and the municipality. Structural work such as load-bearing wall removals, beam and column changes, foundation underpinning and certain mechanical or site grading designs commonly require drawings sealed by a licensed Professional Engineer (P.Eng., PEO). We confirm the applicable requirements for your project before submission.

EXAMINATION & DEFICIENCIES

How does AECS manage city examiner comments and deficiency notices?

When examiners issue comments or requests for clarification, AECS reviews each item and prepares a point-by-point response letter with coordinated drawing revisions where required. Clear, complete responses help reduce additional review cycles, though final decisions rest with the municipality.

SITE INSPECTIONS

What mandatory site inspections occur during construction?

Municipal building officials typically conduct staged inspections, which may include footings before concrete placement, structural framing, plumbing rough-in, insulation and air barrier, and final inspection. The required stages are listed on your permit; general review by the design engineer may also be required for engineered elements.

REGULATORY & MUNICIPAL JURISDICTION NOTICE

Review timelines, fees and permit decisions are set by municipal building departments and other authorities having jurisdiction (AHJ). AECS prepares careful, code-referenced engineering documentation to support a complete submission, but cannot guarantee approval or timing.

(Required)
Current Drawings Readiness

ENGINEERING & PERMITTING ESTIMATES

Request a Permit Quote

Submit your property address, project scope, and current drawing status to receive a detailed engineering scope assessment and permit application estimate from our licensed engineering team. Have questions before you request a quote? Contact the AECS team through our Contact page.

* Disclaimer: Official building permit processing timelines, municipal fees, and final approval decisions are governed solely by the respective municipal building department authorities. Engineering proposals provide professional consulting and drawing scopes based on applicable Ontario Building Code standards.